A general increase in transformer dielectric failures in the Brazilian transmission system, some of them with no specific causes, motivated the start up of a Cigré Joint Working Group JWG A2/C4–03 Electrical Transient Interaction between Transformers and the Power System. This group has been gathered to assess and discuss the different types of electrical transient interaction between transformers and other components of the T&D power system that could explain some of these failures. The main focus of the JWG is to pursue an improvement of the system reliability based on recommendations regarding the electrical transient interaction between transformers and the power system. This takes into account the necessity of detailed transient studies looking for an upgrade in equipment specifications, system planning and operation criteria. The working group started its activities in May 2005 and is composed of around 30 members, representing utilities, research center, manufacturers, universities and the national grid system operator. The objective of this paper is to present the work that has been carried out so far by the JWG including the main discussions and the conclusions already reached.

Downloads

Download data is not yet available.

Published

2022-08-22

Issue

Section

Special Issue Article

Similar Articles

You may also start an advanced similarity search for this article.